If you are a WA builder or civil contractor, the single biggest risk on any project is not the weather or the subbies. It is discovering, after something has gone wrong, that your Contract Works policy was never built to cover what actually happened.
Most Contract Works claims that get knocked back in Western Australia fall into three categories: damage to existing structures during the build, defective workmanship exclusions, and delay-related losses. In almost every case, the problem was baked into the policy long before the claim was lodged. The cover looked fine on paper. It just did not hold when it mattered.
This article walks through the three claim scenarios we see most often, why standard policies fall short, and what a properly structured Contract Works policy should address before you break ground.
Worried your current Contract Works cover has gaps? Read more about Contract Works insurance before your next project starts.
Why Do So Many Contract Works Claims Get Rejected?
The short answer: most policies are sold as a generic template and never mapped against the specific work being done. A Contract Works policy for a fit-out job is not the same as one for a civil earthworks contract near existing infrastructure, but the paperwork often reads identically.
When a claim is denied, it is rarely because the builder was reckless. It’s because the policy contained an exclusion, a sub-limit, or a definition that did not match the reality of the site. These three scenarios are where this happens most:
Claim 1: Damage to Existing Structures During the Build
This is the classic WA civil and construction claim, and one of the most misunderstood. Picture a contractor extending an existing warehouse. During excavation, a footing shifts and cracks the original slab and a section of external wall. The new works are fine. The damage is to the structure that was already there.
Where Standard Policies Fall Short
Many Contract Works policies cover the contract works themselves, meaning the new construction, but treat the existing structure as a separate matter entirely. Some exclude damage to surrounding or existing property unless it has been specifically added and valued. Others apply a sub-limit so low it does not come close to the cost of repair.
The builder assumed the whole site was covered. The policy only ever insured the new build.
What a Properly Structured Policy Should Do
- Include a specific Existing Structures extension, with a limit that reflects the real value of what is on site.
- Clarify whether damage caused by the works themselves is covered, or only external events like fire and storm.
- Account for the physical relationship between the new works and the existing building, not just the contract value.
If you are working on, over, or next to something that already exists, this needs to be confirmed in writing before day one.
Claim 2: Defective Workmanship Exclusions
This is the one that catches out the most experienced builders, because the wording is genuinely confusing. Almost every Contract Works policy excludes the cost of rectifying defective work itself. So if a wall is built poorly and needs to be rebuilt, the cost of rebuilding that wall is not covered. That part is standard, and it is fair. Insurance is not there to pay for poor workmanship.
Where Builders Get It Wrong
The critical question is not whether the defective work is covered. It is whether damage caused by the defective work is covered.
Say a defectively installed pipe fitting fails and floods a completed section of the building. Some policies exclude both the faulty fitting and all the resulting water damage. A better structured policy excludes only the cost of the defective fitting itself, while covering the flood damage to the rest of the works. That difference can be tens of thousands of dollars, or far more.
What to Check Before You Sign
- Look for the distinction between the defective part and the resulting damage. The narrower the exclusion, the better your position.
- Understand the exact wording of the Defects Exclusion clause. There are several standard versions in the market, and they are not equal.
- Ask your broker to explain, in plain English, what happens in a real defect scenario on your type of job.
If nobody has walked you through this, you are guessing about a clause that decides whether your claim succeeds.
Claim 3: Delay-Related Losses
The third scenario is the one builders rarely think about until a project stops dead. A major storm damages a partially completed structure. The physical damage is covered under the Contract Works section. But the repair pushes the project six weeks past its completion date. That delay triggers liquidated damages in your head contract, extra hire costs, and lost income on the next job you cannot start.
Where Standard Policies Fall Short
Standard Contract Works cover pays to repair the physical damage. It typically does not cover the financial consequences of the delay caused by that damage. Delay in Start-Up or Advance Loss of Profits cover is a separate section that many policies simply do not include, especially on smaller contracts.
The builder recovers the cost of the repair, then absorbs the far larger cost of the time lost. That is where projects and businesses come under real strain.
What a Properly Structured Policy Should Address
- Confirm whether delay-related losses are covered at all, and if so, up to what limit and indemnity period.
- Match the cover to your actual contractual exposure, including any liquidated damages in your head contract.
- Consider Business Interruption cover alongside Contract Works for projects where a delay would flow through to the rest of your operation.
This is exactly the kind of exposure that gets overlooked when a policy is priced on premium alone.
Not sure which of these three gaps applies to your projects? Book a Contract Works review with Westside Insurance Specialists.

The Common Thread: The Claim Is Decided Before the Project Starts
Every one of these scenarios has the same root cause. The policy was arranged as an admin task, not built around the actual work, the actual site, and the actual contract.
At Westside, we read your project before we read your policy. That means confirming what is next to your works, understanding your head contract obligations, and explaining the defect and delay wordings in plain English, so there are no surprises when a claim is lodged.
And if a claim does happen, our Claims Process means someone is in your corner pushing the insurer for a fast, fair outcome, not leaving you to fight it alone mid-crisis.
Get Your Contract Works Cover Reviewed Before You Break Ground
The right cover only counts if it is built on the right understanding of your project. If your current policy has never been checked against the three scenarios above, now is the time, not after the claim.
Book a Contract Works review with Westside Insurance Specialists today, and know exactly what you are covered for, and why, before anything goes wrong.
Westside works with WA-based businesses across Perth metro and regional areas, including mining contractors, civil subcontractors, rural operations, and not-for-profits. We specialise in high-stakes industries where generic cover leaves builders and operators exposed.
Important Information
This communication, including any weblinks or attachments, is for information purposes only. It is not a recommendation or opinion; your personal or individual objectives, financial situation or needs have not been taken into account. This communication is not intended to constitute personal advice.
We strongly recommend that you consider the suitability of this information, in respect of your own personal objectives, financial situation and needs, before acting on it. This document is also not a Product Disclosure Statement (PDS) or a policy wording, nor is it a summary of a particular product’s features or terms of any insurance product. If you are interested in discussing this information or acquiring an insurance product, you should contact your insurance adviser to obtain and carefully consider any relevant PDS or policy wording before deciding whether to purchase any insurance product.